Substation 16.1
CONTRACTOR: Renova Energia S.A
OWNER: Renova Energia S.A
2018 – Caetité, Bahia
Installation of input modules with maneuvering and busbar infrastructure at 34.5kV for interconnection of Collecting Networks to transformers;
Installation of 2 (two) 34.5-230kV elevation modules for 34.5-230kV transformers and connections with maneuvers of transformation modules with 230kV outputs;
The installation of 2 (two) maneuver modules for feeder line outputs of the 230kV circuits to Pindaí;
Construction of a Command Room for the Supervision and Control Panels and Auxiliary Services System and Construction of a Room for the GMG Shelter;
Construction of the entire drainage system, cable channels, urbanization, paving, foundations, earth mesh and closure; Supply of materials and electromechanical assembly of all the necessary infrastructure for the implementation and energization of the Substation.